Ghana2016–2017

Grid Intensification Design Services – Upper East and Upper West

HV and LV distribution design services for beneficiary communities in NEDCo’s Upper East and Upper West operational areas.

PROJECT OVERVIEW

Scope of services

  • Prepared geo-referenced HV planimetric drawings, single-line diagrams and LV distribution network designs.
  • Developed work schedules and bills of quantities to support bidding documentation.
  • Optimized 34.5/11.5 kV network design to improve HT:LT ratio, reduce losses and maintain voltage profile.
  • Applied LV design considerations to reduce electricity pilferage and used HVDS-oriented transformer sizing to limit LV network length.